Inspection register
Field quality evidence
Illustrative inspection records of the kind Asite Field captures on site. Inspectors and areas are demonstration values; no real inspection data is shown.
Inspections recorded
Scenario55
First-time pass rate
Scenario40%
Failed inspections
Scenario15
Each failure can raise a non-conformance.
Failed inspections by area
Illustrative concentration of quality issues.
Inspections
Search by checklist, area or inspector; filter by result.
Scenario
| Linked NCR | Captured in | ||||||
|---|---|---|---|---|---|---|---|
| Rebar fixing verificationINS-ARENA-501 | Zone B core | Arena Superblock | 11 Jul 2026 | fail | 16 | — | Asite Field |
| Hard landscape levelsINS-ARENA-504 | External works | Arena Superblock | 16 Jul 2026 | pass | 9 | — | Asite Field |
| Fire stopping auditINS-KSU-502 | Zone C perimeter | KSU Utilities | 18 Jul 2026 | pass | 5 | — | Asite Field |
| Hard landscape levelsINS-EXC-504 | External works | Phase 2 Excavation | 19 Jul 2026 | pass | 6 | — | Asite Field |
| Concrete pour pre-checkINS-OPERA-500 | Zone A podium | Opera House | 21 Jul 2026 | pass | 9 | — | Asite Field |
| Mechanical plant set-outINS-EXC-503 | Plant room 1 | Phase 2 Excavation | 21 Jul 2026 | fail | 5 | — | Asite Field |
| Fire stopping auditINS-WALDORF-502 | Zone C perimeter | Waldorf Astoria | 21 Jul 2026 | pass | 19 | — | Asite Field |
| Concrete pour pre-checkINS-ARENA-500 | Zone A podium | Arena Superblock | 22 Jul 2026 | fail | 6 | — | Asite Field |
| Concrete pour pre-checkINS-KSU-500 | Zone A podium | KSU Utilities | 27 Jul 2026 | pass | 12 | — | Asite Field |
| Concrete pour pre-checkINS-WADI-500 | Zone A podium | Wadi Safar | 27 Jul 2026 | pass with comment | 8 | — | Asite Field |
55 of 55 illustrative records match. Export includes all filtered records.