Illustrative inspection records of the kind Asite Field captures on site. Inspectors and areas are demonstration values; no real inspection data is shown.

Inspections recorded

Scenario

55

First-time pass rate

Scenario

40%

Failed inspections

Scenario

15

Each failure can raise a non-conformance.

Failed inspections by area

Illustrative concentration of quality issues.

Scenario

Inspections

Search by checklist, area or inspector; filter by result.

Scenario
Linked NCRCaptured in
Rebar fixing verificationINS-ARENA-501Zone B coreArena Superblock11 Jul 2026fail16—Asite Field
Hard landscape levelsINS-ARENA-504External worksArena Superblock16 Jul 2026pass9—Asite Field
Fire stopping auditINS-KSU-502Zone C perimeterKSU Utilities18 Jul 2026pass5—Asite Field
Hard landscape levelsINS-EXC-504External worksPhase 2 Excavation19 Jul 2026pass6—Asite Field
Concrete pour pre-checkINS-OPERA-500Zone A podiumOpera House21 Jul 2026pass9—Asite Field
Mechanical plant set-outINS-EXC-503Plant room 1Phase 2 Excavation21 Jul 2026fail5—Asite Field
Fire stopping auditINS-WALDORF-502Zone C perimeterWaldorf Astoria21 Jul 2026pass19—Asite Field
Concrete pour pre-checkINS-ARENA-500Zone A podiumArena Superblock22 Jul 2026fail6—Asite Field
Concrete pour pre-checkINS-KSU-500Zone A podiumKSU Utilities27 Jul 2026pass12—Asite Field
Concrete pour pre-checkINS-WADI-500Zone A podiumWadi Safar27 Jul 2026pass with comment8—Asite Field

55 of 55 illustrative records match. Export includes all filtered records.